Wednesday, 29 October 2014

Floors

It’s been a long time coming but we now, finally, have a floor downstairs (well not a kitchen floor but the rest of the downstairs!)  This work couldn’t start until after the internal insulation was completed which in turn was delayed by the windows so we had hoped that Mike (flooring guy) would start within a week of the insulation being completed.  Unfortunately he didn’t start until 8th October.  There seemed to be delay after delay with this work - originally (re)scheduled to start on the Monday 6th he told us on the Sunday that it would be Tuesday.  Okay, seeing as it was only going to take him 4 or so days and then a day for the staining we felt we could live with that.  In the end he didn’t start until the Wednesday and while there may have only been 4 or so days work for him he was still working away on Saturday 18th when the guys turned up to do the staining!  Anyway, the end result is something that we love.  We struggled a bit over what stain to go with and in the end chose a colour that seemed to surprise the guys doing the sanding and staining and Mike.  Needless to say that got me worried - why? what’s wrong with this colour??  Turns out there’s nothing wrong with it (at least not yet :) )  The parquet floor processed involved laying a 6mm  plywood base, then putting down the herringbone design followed by the border at the end.

Base of Ply before the Parquet goes down

 

Parquet Laying

 

Parquet Floor in Hallway

 

Back room - Completed Parquet Floor

On the Saturday when the guys were doing the sanding and staining we headed off in to Arnotts to order the sofa that we’d picked out the week before.  Assuming no delays (and i’m really not assuming that considering we’ve been hit with delays throughout this process) we’ll have the sofa in time for Christmas!

Michael our builder was lined up to come in on the Monday after the parquet floor was in to do all the skirting boards, door architraves and the kitchen floor tiling.  As we’re putting carpets on the stairs and upstairs they can’t go down until that work is done so I had the carpets lined up to be fitted yesterday (28th).  We got a text on the Sunday evening before Michael was due to start that he was “very sick” with his lungs and would do our job when he was better!  So I postponed carpets and we then wondered what to do.  How ill was he - very or just unwell (we wondered if the use of “very sick” was just down to English not being his first language).  We decided we’d wait a week and then call him to find out how he was doing and to find out of if we needed to get somebody else for the job - which I should say we didn’t want to do.  Michael has done a lot of work for us and we know where we stand with him (he normally finds something to give out about but I just try not to listen to that) and he’d given us a good price.  But this was a our last job preventing carpets (and us) going in to the house.  Anyway the great news is that he was much better and started working yesterday and expects to be finished by the end of the week.  So carpets lined up for next Wednesday.  And after that I guess we clean the place and look at moving in!    The garden is embarrassing at this stage so looking forward to being able to clear some stuff out of it (a lot of rubbish and paint tins!) once we’re done with builders vans in our drives.

Wednesday, 8 October 2014

The Flooring is Next

The insulation has been finished for a few weeks now and it's made the world of difference to the side and back of the house (where it was done externally). We've gone from a dirty white with concrete strips up the side (from repairs) to a spanking clean white exterior. That is, we've gone from Patching up the Cracks to External Insulation Finished I know we lost some space in the front rooms due to the internal insulation but I'm pleasantly surprised to not be noticing it the minute I walk in to one of the front rooms. The depth of insulation is decent enough and is nicely visible (for now) along the windows as we haven't yet got internal cills in place. Just needs a cill now! The flooring was due to start a couple of weeks back but has been delayed until this week with work on the parquet floor actually starting today. I'm really looking forward to have something nicer than this (and the current horrible bare boards) to look at soon :) Hate this Flooring!

More to follow soon, hopefully!

Friday, 12 September 2014

Insulation

Well the windows, finally, after many many weeks of waiting, arrived Wednesday week ago.  Unbelievably they’re still not finished (don’t ask!) but the remaining work is external only and so has no impact on anything else proceeding.  The insulation company arrived to start work on the same day as the windows arrived.  After talking about and waiting for this insulation for many  many months it was v exciting to walk by the house and see their van in the driveway!

Insulation Finally Starting!

  

Today is the last day (or so I’m told) that  the insulation guys will be on site.  The external and internal insulation are now finished and today is tidy up day and the attic too needs to be done (I’m assuming that that too is happening today).  I won’t go as far as using the word “fascinating” but it was definitely interesting to watch the external insulation progress.  After the application of insulation blocks to the side and back of the house, two layers of plaster were added and the render went on yesterday.  The side and back of our house now look shiny new (almost).

External Insulation Happening

External Insulation Plastering

Amusingly we picked separate colours for the render for the side and back as we wanted a more grey colour for the side so that it would fit in with the houses around.  When we were looking at the render last night we had to look very hard to see if different colours were used.  We came to the conclusion that they were but either the wrong colour was used on the side or else the sample book is not at all indicative of the render colours on a large scale as there’s barely any difference at all.  We don’t mind, we’re happy with the look but I’m sure the guys applying it were asking why we had chosen different colours!

There were three types of render we could have used.  Cosi Homes quoted mineral render by default which is the best suited to Irish weather (apparently) but we went with the mid range acrylic render just because it is that bit less expensive!

External Insulation Finished

 

Certainly looks better, in my opinion, than it did when we first bought the place!

Patching up the Cracks

 

The garden unfortunately has gone downhill.  It’s gone from this


The Garden with Potential

to this:

Our Very Own Jungle!

 

 

The front of the house is now insulated internally.  You can get an idea of the depth of the insulation from this photo (hopefully).

Just needs a cill now!

   

The downstairs flooring happens next.  Was hoping that would start in the middle of next week but from what Mike (flooring guy) was saying it could be the week after.  But I can take a delay  of a day or two at this stage.

There’s still a lot to do though at least the majority of the big ticket items are now done!  Wouldn’t mind a finished off hob area though (driving me insane!!!!) and some carpets upstairs...

Wednesday, 27 August 2014

Painting and the non appearance of our Windows

We’ve taken this week of work.  It’s our holidays.  What we’re doing for our holidays is painting.  Oh and we did take Tuesday and tomorrow (thursday)  to do some fun stuff.  We were also looking forward to our side bay windows windows which were due to to be fitted today.  At least we were looking forward to it until we were looking forward to it until I got a phone call at 10am yesterday morning informing me that “there is some bad news”.  To which I immediately responded saying that the windows had to go in this week as we have the previously postponed insulation company due to start new week and I have the guy for the flooring booked in for the week of 15th Sept.  And I can’t be cancelling them again.  Which is of course all well and good but if, as it turns out, ones windows are still in Denmark and won’t be leaving said country until this coming Friday there’s bugger all that I can do about it.  Needless to say I’m less than impressed.  For a start we ordered these windows in June.  And they arrived at the end of July… and at that point everybody realised that there was an issue with the size of the side bays (they’re each 2 inches too narrow!).  Unfortunately, even though this was not our fault, we would have to wait another 6 weeks (make that 8.5 weeks!) for the correct ones to arrive as Rationel shuts down for 3 weeks for hollers.  Isn’t life grand?  Anyway, clearly there’s no guarantee that this won’t happen again this week but right now there’s nothing we can do except hope that they are shipped this Fri and arrive post haste!      

 

So in the meantime we’ve been painting.  We now have a fully painted kitchen and living area.  First coats in front room and the hall way too and three coats on the window wall in the bathroom (this is a different colour to the other walls hence only it being done).  The plumber was out today so we now have a kitchen tap, an installed dishwasher and the hob and oven are in place (the latter is not wired up).

A Kitchen Tap

The kitchen fitter is back out on Friday afternoon (hopefully that won’t be postponed) for finishing touches.  Still waiting for the electrician to get back to me as to when he can come out - reckon I’ll give him a buzz tomorrow (it’s our day off… off to the National Stud and Japanese Gdns :) )  Unfortunately the plumber will be back to tomorrow as we need a new boiler :(  Well that’s not true, we could replace the fan on the existing one but that is nearly the third of the cost of a new one and as we’ve no idea how old the current one is and it’s apparently not a great model so we decided to take the hit now and get rid of it while we’re still a work in progress house.

 

Front Room Painting

Friday, 22 August 2014

Continued Painting

There really has been very little to report over the last while hence the silence on here. The kitchen worktop went in a few weeks back... a lovely quartz worktop that I'm v happy with. We're continuing to have a dilemna over wall tiles, tiles for behind the hob and the floor tiles. The real difficulty with the tiles is finding something that will go with both the worktop and the cupboards; harder than we thought! As the worktop has upstands we're now considering no wall tiles other than around than hob. We still have to find something we like and that could work but... Floor tile wise we have a sample of a dark grey tile which is actually v nice but the kitchen is so darl that I can't help wondering if a lighter tile would be better. But unlike the lighter tile the dark tile helps add some contrast to the space. Bit of a dilemna! Earlier this week I was having a look online at coloured glass specialists. It'll be a while before we can afford to change the glass panes around the door but it was fun to have a look and get some ideas. We're off work next week so hoping to pay a visit to Rathmines Glass. I really quite like this one though as it still allows lots of light through. As our front door is north facing this is important to me. Painting wise we're making progress. It probably doesn't seem like we're going anywhere fast but it's three coats per ceiling and per wall and we have jobs so it's down to one day at the weekend and an hour or two one or two evenings a week. We finished ceilings a few weeks ago and are still working on the kitchen living space. Plenty yet to do - the kitchen is taking forever as everything has to be taped up before each paint. If the tape is going over paint then we take it off at the end of that painting session too which means retaping before the next painting session! Our windows, the correct sized ones(!) are due for fitting next Wednesday or Thursday so the insulation company are lined up to start the week of the 1st Sept and Mike is lined up to start our parquet floor downstairs the week of the 15th. It'll be good to see some real progress happing again. The mess with the windows (not our fault!) really put a hammer in the works time wise!!

Sunday, 27 July 2014

Painting and Bathrooms

The last big thing that can get done before the windows get put in did get done this week and that was the finishing of the bathroom.  The floor tiles had been down for a while and some of the wall tiles but no grouting was in place and none of the bathroom suite was in place.  After a minor flurry of “what the …?!” comments after being told that our sink (which was to be wall mounted) was too heavy for the wall we got what i think is actually a rather nice vanity unit Ikea which works well with the tiles.  The guys finished up on Friday - all the tiles, with grouting in place and we finally have a flushing toilet!  We still need to paint the ceiling and one a half walls in there but other than that it’s done.  Which is great!  The only downside really is that the water coming out of the sink tap is a joke.  It’s a trickle so we’re going to have to get that fixed up!  The floor is still covered in white dust from the grouting powder so I’m quite looking forward to cleaning the floor up to get more brightness from those tiles!

Bathrom

 

In other news we started painting last weekend.  We have a whole house to paint including ceilings, walls and all the woodwork and the front door.  As the whole interior has been replastered that means we’re looking at three coats on everything, joyous work!  We’re doing all the ceilings first and at this stage we have four of nine ceilings done so I feel like we’re making progress.  What really slows us down is actually the application of the painters caulk at the ceiling/wall join that gets applied before the third coat goes on.  We didn’t actually know about this until we turned up at the house on Weds evening to apply third coat to some ceilings and our builder was still there so he mentioned it to us.  It’s not the easiest thing in the world to apply but it’s worth doing I reckon.  Dave was getting very frustrated with it yesterday so I took over.  I reckon it easily took us an hour to apply to the kitchen/dining room but hopefully I’ll get better as I go along!  Have to admit that I prefer applying that stuff and the actual ceiling painting itself (unless it’s the edging in which case I’m quite happy :) )

Prep for third coat

 

Hallway Painted Ceiling

  

Saturday, 19 July 2014

Size Really Does Matter

I know there are plenty of people out there who ask if size matters and let me tell you, the answer is an emphatic Yes when it comes to your new windows!  After a six week wait after placing our order our windows arrived to be fitted last Friday (11th July).  This was a big day for us, as apart from the fact that I hated our existing windows, we had a lot of work that couldn’t be done until the windows went in.  This list included the internal insulation, the plastering of the kitchen wall (and hence the worktop) and the parquet floor.   Our new windows are aluclad from Rationel and while I’ve read and heard some horror stories that people experience when their windows are being fitted we couldn’t find anything negative about Rationel.  They were certainly our most expensive quote but we felt that we were going to get what we were paying for.  

 

We’d been told that the windows would be arriving at 8am on the Friday so we both arranged to take the day off.  I checked my phone at 7.10am that morning, mainly to turn it out to see I already had a missed call.  It turned out it was from  the guy delivering the windows!  For anybody familiar with the BBC adaptation of Pride & Prejudice, think of the scene where Mr. Bingley arrives at Longbourne early in the morning to propose Jane.  Jane isn’t yet dressed so Mrs. Bennet proposes sends Mary (or is it Kitty?) down until Jane is properly dressed and ready to receive suitors.  That is totally the image that came to my mind that morning.   Dave had had his shower so he was sent down to Neidin to meet this guy and hand over a bankers draft for the remainder of the payment.  By the time that I got down a little after 8am the place was a hive of activity with windows being unloaded and brought in to the house!

 

Carefully Does It

    

I was so excited at the thought of finally getting rid of the horrible windows in the house that i made poor Dave pose for a photo outside one of them :)

Nearing the End

 

We hung around for a little while but left not too long after (for a yummy coffee and pastry in Gusto Italiano) as no matter where we turned we nearly always in somebody’s way!  Honest to God though, they had most of the old windows out by the time we were leaving!

Removal of old Bay Frame

 

 A couple of hours later I arrived back down to the house to be met by a friendly as ever Tom who informed that “we have a problem”.  When you’re getting windows in that can really only mean one thing… something somewhere doesn’t fit.  And that’s exactly what it was.  The bay windows (upstairs and downstairs) each come in three pieces - the centre windows and the two side windows.  There are of course numerous other bits and pieces to go with that but, to cut a long story short, each of the two side windows was 2 inches, too narrow.  Two inches.  That’s four inches of missing window from each of the bays!  This bad news was further compounded by the fact that it takes six weeks to make a Rationel window (five weeks at a push) and Rationel were going to be starting their 3 week holiday that following week.  And when I say Rationel were going on a 3 week holiday I don’t mean the office, I mean that the whole operation in Sweden shuts down for three weeks!  To be honest, there was no point getting annoyed or angry with Tom.  He admittedly straight away that this was Rationel’s error and it was a mistake. I mean one of the things that i do for a living is write and review code.  I know that bugs get in to code.  And I guess there’s no reason why code should be the only thing that bugs get in to.  At that point in time I naively thought that the insulation would still continue and while they wouldn’t be able to do internal on the front the flooring might still be able to happen (turns out that neither or happening until new windows go in).  Anyway, the upshot is that the the four new windows are on order and expected to be fitted some time the week of 25th August.  A little later than I would have liked (obviously) but such is life! In the meantime they’ve fitted the incorrectly sized windows so that the house is weatherproof until the new windows arrive.  And we’re happy with what we’ve got to date.

Busy Busy

 

 

Below is a photo of me amusing myself earlier in the day when the windows were still being unpackaged :)

 Taking Photos

 

I do like our new french doors (I’d prefer if they were wider but that’s down to us not widening the space rather than measures this time!).  Ignore the jungle out back… we’ll get to that in time!
New French Doors

Saturday, 28 June 2014

Bathroom Tiling and Other Bits & Pieces

The bathroom work has started.  At long long last we are seeing some progress (other than the kitchen of course!) happening n the house.  Our kitchen cupboard door handles went on this week and I have to say that i really like them!  The measuring for the quartz worktop also took place but I’ve asked them to postpone installation until the plastering is finished after the windows go in.  I’m getting up stands for the work top so I just think it would be weird to plastering down to their level but not have plastering in behind.  It’s not a bit thing but as the plasterboard is already in place it’ll only be skim of plaster so it won’t affect the worktop measurements.  The guys are fine with this so long as it doesn’t run in to their company’s holidays (we’re getting worktop from Stone Solutions in Gorey).   We now have a number of things dependent on the plastering (and hence the window fitting dates) - kitchen worktop and parquet flooring work commencement!  Here’s the kitchen in it’s current non-glory...

Kitchen With Handles

Tubs & Tiles finally (and I mean finally) got delivery of the rest of our tiles this week so Dave collected them on Wednesday.  His poor car... the suspension felt it I think :)

I popped in last night to check out the bathroom progress… it’s a little weird as no grouting is being done (even on the floor) until after the windows are in but I *think* I like the floor.  It’s weird but I either love or hate the floor tiles and I’m not 100% sure which it is yet.  I think I love them :) 

The bathroom tiling is started!

 

Future work is that we’re looking at the week of the 7th July for the window installation… I believe that they left Denmark yesterday (we’re went with Rationel).  The insulation (internal on one side and external on two sides) should be happening at the same time.  Once the windows are in the plastering should finish on the front and back of the house.  Then my quartz work top can go in.  We have Mike lined up tentatively to start work on the ground floor parquet flooring the week of July 21st.  Maybe I’m being very optimistic with all those dates but I hope not!   The one thing that I feel that we can’t really do until the kitchen worktop is in is to pick the kitchen floor and wall tiles.  But hopefully that won’t be too much of an issue.

Now that we’ve decided on our initial paint colour for the house interior (Dulux Celestial in the bathroom, French Silk for the kitchen and Soft Cream or something or other for the rest of the house) I may even start on painting tomorrow (depends on weather I guess of course :) )  

 

 

Monday, 23 June 2014

Paints and Kitchen

So the kitchen is progressing nicely though it was at a bit of a stand still for the latter part of last week. We expected it to be finished up on Wednesday but by Thurs evening it was still unfinished. The doors were on but no handles and a general tidy up was still required. Dave had also noticed that we'd been given a chrome tap instead of the requested stainless steel one. I phoned on Friday morning and turns out that there's a delay with the door handles. Personally I don't think that it would have hurt to pick up the phone and just let us know that but not something that I'm going to get in to a tizz over either! They're apparently being delivered today so hopefully today or tomorrow they'll be fitted. I had a call from the guys who'll be doing out work top this morning to say they were leaving Gorey and what time would suit to let them in. I had to sort of point out that I was in work and that nobody had told us they'd be coming up today! Anyway, as one of the fitters from Domino Kitchens still has a set of our keys I believe that they're synching up for that. I'll ned to phone tomorrow to ensure that I get the type of drain that I want on the worktop! At the weekend Dave started work on scraping the front walls where the internal insulation is going to go. Neither the builder nor the insulation guys themselves believe that this is necessary but Dave read an article that said that it's best to have the wall exposed back to the original brick/concrete before the internal insulation goes on. It makes sense as it removes any hidden layers of damp where mould got fester behind the insulation. Plenty of dust encountered while doing that work I believe :) I had the much more onerous task of painting up wall testers! Rather than deciding on our colour scheme now I want us to just get the place painted (as it's all bare plaster) and then we can decide on colours at our leisure. Seriously though, who knew how hard it would be to pick a single neutral, bright, NOT white colour for the whole house??!
Coffee and Paint Testers Trying to decide on a neutral colour... We ended up buying yet another tester yesterday but that's it, we just have to decide now. I like both our bathroom options actually. I think I prefer the the darker blue (Celestial) while Dave prefers the icier lighter blue (Nordic Blue) but I accept that the former is darker. Having said that only one wall will be fully painted, another will be half white tile and half paint and another completely tiled so I'm thinking that I may have argument for pushing the Celestial. I'll put some of the other tiles (different designs) out this evening and look again.
Bathroom Paint Options In fairness to myself I also spent an hour making what seems like a feeble attempt to trim back our very own Bray jungle. Some effort made but not posting any photos of that considering it still looks a nightmare! Oven and hob purchased yesterday too. I now own a gas hob :)

Wednesday, 18 June 2014

The Kitchen

The kitchen got delivered yesterday!  John (from Domino Designs) phoned me on Monday evening to let me know that the clutch had gone in their van on Saturday but not to worry they’d be delivering our kitchen in their horse box!  I asked if the horse came free with the kitchen but apparently the horse is in horsey heaven so no.

Kitchen Transport :)

We were down there on Monday evening where I made some attempt to clear the kitchen space for fitting.  Very very dusty and not particularly easy to do (seeing as I came straight from work… possibly not the cleverest idea!) but I think it was okay.

Kitchen space ready for new kitchen

 The guys turned up on the dot of 9am yesterday which was great for me. I reckon they had everything unloaded within 20-30 mins and then one fitter stayed for the day and is back there today and then we should be done… well done bar the worktops.  Can’t even measure for the worktops until the kitchen itself is fitted!  We’re thinking we might actually purchase some appliances this weekend!  Here’s how things were looking last night… exciting :)

Kitchen in progress

The wire baskets in that corner unit are something we salvaged from the old kitchen.

Kitchen Installation

The wire carousel is also a it of salvaged old kitchen.

Kitchen Installation

So too are the pull out wire spice racks :)  And for one final picture… for this post at least!

In progress kitchen

 

Bathroom Progress

We have a shower tray.  Well, we’ve had a shower tray for quite some while but the shower tray is now in the bathroom.  I know you’d love to see a photo but trust me it isn’t that exciting and even I couldn’t be arsed taking a photo of a shower tray in a bare bathroom!

Dave collected the floor tiles over a week ago but tiling has still not started and what they didn’t tell us when ordering is that the plain white wall tiles weren’t in stock!  Then last Saturday Dave decided to count the floor tiles that we’d been given but it turns out that they didn’t give us enough.  I mean not enough to floor the whole room but also not as many as we actually paid for.  We’re still waiting.  I‘m a bit annoyed about this - we went with uneven mix of colours for the floor tiles as we didn’t want to wait two weeks for more to come in stock and we’re already at the two week mark now anyway!  I think they’ll look great once they’re down though...

Bathroom tiles...

 

Our actual bathroom suite has also been delivered and is awaiting installation - it needs the tiles to go in first!

Saturday, 31 May 2014

A Lovely Weekend of Not Very Much

Dave’s away this weekend.  Work on the house has practically stopped so I’m doing nothing this weekend. Nothing.  Well, that’s not quite true but let’s say nothing major.  I have confirmed that the Revenue property ID pin that they sent me out works for my current apartment not for the property id of the new house so need to fix that.  And if there are any sales on I may go looking for a fridge but other than that I’m doing  nothing house related.  

Instead i shall do things that have needed doing for months like getting my hair cut, visiting my nephew, seeing my sisters house etc!  Read.  Maybe go for a stroll up Bray head.  Drink some wine.  You get the idea.

We paid window deposit this week - Rationel won in the end.  Cosi Homes were out to discuss insulation work.  Kitchen is progressing (one hopes!).  I’ staying quiet.  

Have a lovely long weekend!  

 

 

 

Saturday, 24 May 2014

An Update From The Last Week

The last few weeks seemed to just, out of the blue, get very busy.   We found that we needed to make decisions on certain things if we didn’t want to hold up the building work.  As last Saturday became all about buying the bathroom and nothing else we took Tuesday off to try and get through a few more things.

 

We started with heading to Domino Designs where we paid our kitchen deposit, confirmed kitchen colour, picked tap etc.  We have a fitting date of June 16th which will be great if met so fingers crossed!  I was on to them yesterday as they still hadn’t been down to take out the wire carousel, spice racks and pull out wire baskets from the existing kitchen (currently  under cover in the back garden) that we intend to reuse in the our new kitchen (desperately trying to keep that price down).  We’re also waiting for plug socket plan also.  They told me that they’d head there yesterday afternoon so fingers crossed that they did.  We’ll be heading down there in a bit (plumber on way) so I’ll look to see if anything looks like it’s been even vaguely disturbed.  I sincerely hope so.

 

We visited the Rationel showroom also.  We’d been to the Sean Doyle showroom the previous Thursday morning where there was lots of discussion on colours, window design etc.  The Rationel showroom was very quiet and tame in comparison.  A pretty flat experience to be honest and I left feeling somewhat underwhelmed.  Having said that Dave can’t find anything negative about them on the web (unlike other window brands which seem to have definitely mixed reviews especially in relation to fitting) so they’re definitely still in the running (and right now it looks like we’ll go with them).  After that we headed to a flooring place out in Kylemore where it looks like we found the traditional parquet plank size at a much more affordable price than what we’d seen to date.  The wood itself is unfinished so on top of the purchase and fitting price there’d also be a priming and varnishing price but it should still be something that we can stretch too.  

 

The bit that we left to last is something that we were finding nearly the hardest to do - tiling for the bathroom.  While I don’t mind (too much) the idea of a black and white floor I do not want a black and white bathroom.  But it just seemed odd to me to introduce colour on the walls if the flooring is black and white.  So then we might see wall tiling that we liked but we’d struggle to see floor tiles that would work with that… or vice versa.  However, we think we may have finally solved the problem by going for what could best be described  as a busy floor tile and plain white wall tiles.  Nothing purchased yet but that’s the route we’ll be going for now.  Tiles picked out in Tiles & Tubs in Sandyford.

 

Arnotts warehouse sale this morning - decidedly disappointing!  But Dave at last persuaded me to visit Ikea as we were so close (warehouse sale was in Santry).  We picked up the track lighting and Led bulbs for the kitchen… and gooseberry jam for Dave’s Mum :)

 

Oh!! We finally decided on our insulation dilemma in the end!  There’s no question over the external for the side and back of the house but we’ve been torn over what to do with the front as the it distinctive quoins and a large pebble dash.  An external insulation finish could replicate the quoins but was always going to struggle with the dash due to the stone size (which is a real issue when we have a semi-d).  So we decided to go with internal insulation for the front.  So once the windows are done the front walls can lose their somewhat currently exposed finish...

Front Bedroom

Monday, 19 May 2014

We've bought a bathroom...

Well we’ve paid the deposit at least.  

So in the last week things have been a little hectic (both at work and with the house renovations!)  The bathroom has had a lot of work done on the walls and the bathroom floor now has two 18mm layers of plywood with tanking system paste on it (whatever the hell that is!).  It’s still pretty bare but it’s looking a lot better than before.  

 

Bathroom's Improving...

Wednesday evening was a little on the stressful side as Dave arrived home and told me that Michael needed to know what shower tray we’d be getting as that was required so that the builders could continue work on the bathroom.  Something about needing to know the exact placement of the drain as that was going to hook to a pipe between the joists on the floor.  Basically they needed to know so they could carry on with the bathroom flooring going down and the kitchen ceiling going up.  That led to a lot of measuring, thinking we’d made a decision and then realising that as soon as we put a sink we’d be blocking off access to part of the bathroom!  

Dave chatted with Michael the following morning and a decision was made on a 1200mm x 900mm shower tray just with the shower head not going in quite the ideal location but it resulted in something that looked like it would work.

On Saturday morning we headed down to Tom Doyle Supplies on the N11 outside of Gorey.  While there we spoke with a very helpful guy Billy who really knows his bathrooms!  Apart from the fact that he kept trying to change our bathroom design (yes I know it’s less than ideal but it’s tied down now!)  he spent over 2 hrs with us giving us lots of advice.  We left having purchased a toilet, sink, shower and all the other bits and pieces come with each of those.  The only thing left that we need is a shower enclosure… they’re expensive!

On Friday we gave the go ahead for our kitchen.  We’re meeting with John tomorrow to discuss the fine details (such as the tap and deposit!) tomorrow morning.  The only thing slowing everything down will be the fact that the kitchen measurements can not take place until the final plastering in the kitchen is complete. Hopefully that will happen this week!  Dave’s job to find out tomorrow.  The guys took out the old kitchen, or most of it at least last week and opened up the chimney space where the cooker and hob will go.  With the partition wall knocked back the place looks so much better (it my not look like it but trust me it does!)

Cooker Location

 

Remains of the Kitchen

 My bannisters is looking a little worse for wear at the moment but my fireplace is slowly reappearing...

Homely Living Room

My sister, her husband and the kids came to visit at the weekend.  I did warn Ciara that I had my suspicions that the house is not quite child safe at the moment (i.e. it’s so not child safe!) but kids were fine - hands held firmly :)  And here’s Grace collecting stones on the beach before viewing the house...

Grace Collecting Stones...

Saturday, 10 May 2014

And That's Another Saturday Gone!

Today was yet another busy house day.  Our first appointment was with Ferndale Kitchens/Domino Designs in Bray regarding plan for the kitchen… and most importantly what that might cost to make real.  We have (sorry, had) a budget for the kitchen.  We loved the plan.  I did question about the draining board for the kitchen (assuming we get the quartz worktop that i really want!) but got told that the grooves come for free with that. I asked if they really worked and laughingly got told No.  I assumed that this was a sarcastic response but as the conversation progressed I realised it wasn’t!  So we got told what the other two options were (both of which cost extra) and it seems to me that the only viable practical solution is, of course, the most expensive at an extra €480. I accept that  that may not seem like much in the grand scheme of things but considering all the little things that have been found and addressed during the renovation work plus the fact that the kitchen quote we were given (excluding the worktops) comes in at what was our total budget for a kitchen (one including worktops and tiles on wall!) then you can understand how that little extra makes a difference! Anyway, I suspect that it was a case of our budget being highly optimistic more than a case of us being given a high quote.  But I like to think that the first quote one gets is not the best quote that could be on offer.  So now I just have to figure out how to get to that best price.  I’ll deal with the quartz worktops (looking at €2500 for those!) at another time!

 

After that we headed off to the Cosi Homes showroom in Ashbourne.  We’re torn about whether or not to internal or external insulation on the front of the house.  Everybody says “Oh you can’t do external on that” but we’re the ones that are going to be living there and yes we want to be sympathetic to the surrounding houses but we also need to be dry and warm! Oh and if we don’t do external then we have to do full internal not eh front of the house which means 82mm depth lost from front the front room and the front room is not big to start with.  Anyway, I was pleasantly surprised though I guess no decisions have been made.  We were lucky to get a sample to take away with us… the colours aren’t right and the pebbles aren’t as big but we know we can’t get the pebbles as bit so it’s just a case of deciding if we think it looks okay...

 

External Insulation Potential

 

We did a quick visit to B&Q… lovely decorative tiles but didn’t see anything I’d like for actual flooring.

In the afternoon it was back to the house to take some more photos of work in progress and the kitchen so we can try and sell it online!

 

The driveway is really progressing… the hardcore came during the week, the cobbles are down so now we just need crushed stones for the tops.  It’ll look so good when done - or at least a hundred times better than it did when we bought the place!

The Driveway is Coming Along!

 

The Driveway is Coming Along!

 

The ceiling is gone from the kitchen exposing the rafters and floorboards from upstairs.  Luckily (well it’s all relative!) only joist has water damaged from the dodgy bathroom upstairs so there’ll be a bit of strengthening required there a steel beam will go in in the kitchen to support the upstairs.

Water Damaged Joist

  

 While the bathroom is currently hugely unattractive (see previous post!) there are some lovely colours showing on the exposed wall at the moment...

Bathroom Colours!

 

And last but not least here are some photos of the current state of the front bedroom and walls in the lounge.

Front Bedroom under RepairA tidy fireplace